Spartan was specifically selected to perform the construction on the Latimer 345kV Transmission Replacement Project due to the complexity and coordination required to remove existing 345kV transmission facilities in a constrained work area adjacent to a major 345kV substation. The work was performed under an outage window that provided limited time for all work to be performed. A detailed work plan was developed through significant on‐site preconstruction coordination with the project owner and engineer.