Taygete Solar 138kV Transmission Line Project

Spartan’s acceleration plan enabled a high rate of safe production that allowed our customer to meet its required interconnection date

Construction of a 138kv Double Circuit Transmission Line Project Located near Pecos, Texas.

Scope of Work

  • Installation of (27) caisson foundations and (71) direct embed steel monopoles
  • Installation of 10 miles of double circuit and 1 mile of single circuit two bundle 954-KCMIL ACSR conductor and two bundle 48 count OPGW
  • ROW services include installation and repair of fences and gates
  • Installation, maintenance, and removal of Stormwater Pollution Prevention BMPs